INSTALLED CAPACITY OF WIND POWER PROJECTS IN INDIA

Sl. No.

State

Capacity Addition During

2022-23

Cumulative Installed Capacity

(As on 31.03.2023)

1

Andhra Pradesh

0.00

4096.70

2

Gujarat

769.70

9978.90

3

Karnataka

164.05

5294.95

4

Kerala

0.00

62.90

5

Madhya Pradesh

324.40

2844.30

6

Maharashtra

0.00

5012.83

7

Rajasthan

866.60

5193.40

8

Tamil Nadu

150.80

10017.10

9

Telangana

0.00

128.10

10

Others

0.00

4.30

TOTAL (MW)

2275.55

42633.12

Note: Out of above MNRE have mentioned that 89.215 MW (88.895 MW in Gujarat and 0.32 MW in Maharashtra) have been de-commissioned. Therefore, the balance installed capacity works out to 42543.90 MW.