The Solar Energy Corporation of India (SECI) has amended the Request for Selection (RfS) for 2500 MW of ISTS-connected wind-solar hybrid power projects (Tranche-I).
As per amendment, the capacity of ISTS-connected wind-solar hybrid power projects has been reduced to 1200 MW from the earlier 2500 MW and ceiling tariff has been reduced from 2.93/kWh to 2.60/kWh.
Subsequently, SECI has postponed its hybrid tender for 1200MW for the fifth time due to low ceiling tariff. The auction, which was to be held on October 26, is now set for November 14.